A Four-Week Course Development Cycle That Actually Holds

How I run concurrent course development against moving technical requirements

Short cycles do not survive on effort. They survive on a fixed decision rhythm: what gets decided in which week, who decides it, and what happens when the equipment spec changes in week three.

4
Weeks per cycle
1
SME review pass
3–4
Concurrent projects
Wk 2
First working prototype
Week 01
Intake & Scoping
Audit the raw source material as it actually arrives — slide decks, specs, schematics, photos, standard operating procedures. SME kickoff to define the performance task: what must the technician be able to do on the floor?
Out: scoped performance objectives, source inventory, known gaps
Week 02
Architecture & Prototype
Modular outline and storyboard. A rapid prototype of one representative segment goes to the SME early, so alignment happens on a real artifact rather than on a document describing one.
Out: modular outline, storyboard, one built segment for sign-off
Week 03
Build & Single-Pass Review
Full authoring against the approved storyboard — module, job aid, or both. SME review is structured as a single consolidated pass with a defined response window, not an open comment thread.
Out: complete draft, consolidated SME feedback, technical accuracy confirmed
Week 04
QA, Pilot & Deploy
Accessibility and QA pass, LMS publication with enrollment rules set, and a small technician pilot before wide release. Feedback loop and measurement defined before launch, not after.
Out: published course, pilot feedback, measurement baseline

The cycle only works because the four weeks are not interchangeable. Each week has a different kind of work — discovery, structure, production, verification — and different kinds of work can overlap without colliding.

Staggered by a week, three or four projects sit in different phases at any moment: one in intake while another is in build and a third is in pilot. The load balances because I am never doing SME discovery for two courses in the same week. When a project slips, it slips into a phase the next project is not occupying.

Week 1Week 2Week 3Week 4
Course AIntakeArchitectureBuildPilot
Course B—IntakeArchitectureBuild
Course CPilot—IntakeArchitecture
Update queueSmall content updates absorbed continuously — they need production capacity, not discovery capacity

Equipment specs change, hardware revisions land, a process gets rewritten. The question is never whether it happens — it is how much rework it costs when it does.

  • Modular authoring is the insurance. Content built as discrete, independently publishable segments means a spec change touches one module, not a monolith.
  • Source material is tracked to the segment that uses it. When a document is superseded, I know within minutes which courses are affected and which are not.
  • Change in weeks 1–2 is cheap; in week 4 it is expensive. That is why the prototype goes out in week 2 — to pull disagreement forward into the cheap part of the cycle.
  • Not everything needs a course. A revised torque value or a changed sequence is often a job-aid update and a notification, not a rebuild. Choosing the smallest sufficient intervention is what protects the cycle.

I have never held an engineering degree, and it has never been the constraint. What SMEs need is not a peer — it is someone who arrives having read the documentation, asks about the failure modes rather than the features, and gives back something concrete to react to.

The most useful question I ask a technical SME is not “how does this work.” It is “what do people get wrong, and what happens when they do?” That single question produces the performance objective, the scenario, and the assessment in one answer — and it moves the conversation from explaining a system to preventing a failure.